Wednesday, June 2, 2010

Week Eight







After Memorial Day weekend the crew were back at work.

The bottom section of the soffit that conceals air conditioner duct work on the main floor of the parish hall is being completed. The plan is for crown molding to be installed at its top edge after the sheetrock is sanded and painted. It will be a huge improvement from the exposed ductwork.

Ductwork is being installed in restrooms on the lower level this week. It took some ingenuity to figure out where to put it, but our hvac crew did it. We will have heat and air for the first time in renovated areas of the basement.

Electrical installation continues. It must be completed before walls can be enclosed in sheet rock.

The old mechanical chase on the north wall of the basement has been removed and will be replaced with a new one.